- Industrial storage halls
- Date added 2006
Prefabricated UT-type hall with a steel structure, located in Týnec nad Labem on the premises of EKO Logistics s.r.o.
| Construction location | Týnec nad Labem |
| Purpose | Material storage |
| Dimensions | 25 × 60 × 5,5 m |
| Hall type | UT – hall with a steel structure |
Installed on an asphalt surface
Eaves flashing above the sliding doors
12× ventilation louvres (sheet metal)
Roof and wall cladding in white PVC technical textile
6× hinged doors on the side of the hall, W 6,000 mm × H 5,000 mm, with galvanized steel sheet infill
6× roof ventilation turbines
By sending this form you consent to allow us to store your personal data in accordance with the provisions of Section 5 (2) of Act No. 101/2000 Coll., on the protection of personal data, as amended. You consent to allow the personal data you provide here to be processed and stored in an electronic database, solely for the purposes of tenders and for a maximum of 1 year. Your consent may be revoked at any time, in writing or by electronic means.
I understandBy sending this form you consent to allow us to store your personal data in accordance with the provisions of Section 5 (2) of Act No. 101/2000 Coll., on the protection of personal data, as amended. You consent to allow the personal data you provide here to be processed and stored in an electronic database, solely for the purposes of tenders and for a maximum of 1 year. Your consent may be revoked at any time, in writing or by electronic means.
I understand